Precautions for on-site installation and commissioning of oil and gas lubrication systems

I. Precautions for design, installation, and piping

1. Before designing, installing and laying pipes, please read the signed technical agreement and the design plan drawings provided to the users in detail; if there is still something unclear, we would like to contact our company. Service.

2.Position of main station of oil and gas lubrication system
Pneumatic pump type main station can be 0.5-50M away from the main equipment and can be placed in the hydraulic station;
The gear pump type main station can be placed in the hydraulic station; the satellite station is placed within 0.5-50M away from the lubrication part of the equipment. It is best to install it near the lubrication equipment.

3. The oil pipe and signal cable from the satellite station to the gear pump main station, the power cable from the main station and the compressed air tube from the main station to the satellite station. The pipes from the satellite station to the primary and secondary distributors to the lubrication points should be connected as required. At the same time, the inside of the pipe is purged and cleaned. For the specifications of the oil pipe, please refer to the design plan description and technical agreement. The pipe layout is combined with the flow chart and the actual situation on site.

two. Requirements for system commissioning

Gear pump type system:
1. The compressed air intake pipe air source of each satellite station needs to be connected.
Ensure that the compressed air supplied to the system is 5-6 bar of clean dry compressed air or nitrogen.
2. The electrical connection between the master station and the satellite station needs to be connected. (Cable 10 core 1.0 square)
The external power supply line of the master station needs to be connected and has power transmission conditions. (AO4 system: 380VAC, 50Hz. 3kw cable 4 core 2.5 square)
3. The main station oil tank is filled with lubricating oil that meets the requirements.
4. The oil pipe from the main station to each satellite station, the compressed air pipe connected to the satellite station, and the oil and gas pipeline from the satellite station to the lubrication point must be connected. (Please refer to the description of the design plan and the technical agreement for the layout requirements and the actual layout of the site)

Air start pump type system: (3-core 2.5 core power cable)
1. The compressed air intake pipe of the main station needs to be connected. Ensure that the compressed air supplied to the system is 5-6 bar of clean dry compressed air or nitrogen.
2. The external power supply line of the master station needs to be connected and has power transmission conditions (AO1 system: 220VAC, 50Hz. 3kw cable, 3 cores, 2.5 square).
3. The main station oil tank needs to be filled with lubricant that meets the requirements.
4. The oil and gas pipeline from the main station to each lubrication point needs to be connected, and the inner wall of the oil and gas pipeline should be cleaned. (Please refer to the description of the design plan and the technical agreement for the layout requirements and the actual layout of the site)

If the lubricating equipment needs to be debugged, please confirm again whether the above conditions have been met and give a written exact answer. After receiving the written reply from your office, we will arrange the commissioning personnel to the site in time; at the same time, please write the name and contact information of your site coordination person in the written reply so that our commissioning personnel can easily contact Relevant personnel in your office contact and coordinate work to ensure that the commissioning of the equipment is completed smoothly and efficiently